Six assignments, without names: the situation, what we did and the result. We do not publish our clients’ names. We do publish the situation, our work and the result.

Relocating production to two countries after a plant closure

The situation
An international group that makes refrigerators for recreational vehicles closed its production plant in Germany. Production had to move to two sites: part of it to China, the rest to the group’s plant in Hungary.
What we did
We ran the project management for the whole relocation. At the receiving plant we cleared the floor space, planned where each production line would go, reworked the process technology during the move and optimised the assembly lines on lean principles.
The result
The relocation finished on time and within the agreed budget. Lean optimisation raised productivity by 15%, and total cost fell by 10%.

Moving a product portfolio from Germany with a clean ramp-up

The situation
An automotive supplier group moved a complete product portfolio from Germany to Hungary: engine covers in several variants.
What we did
We led the relocation and the production ramp-up. We installed the press that was needed, built the stock to cover the changeover, started the sampling runs and carried the APQP and PPAP processes through. Hiring and training the new operators was part of the project.
The result
The project finished on time and within budget. The ramp-up started without quality issues or customer escalations, productivity held its previous level after the move, and labour cost went down.

Getting customer complaints under control at a packaging manufacturer

The situation
A packaging plant had built up 50 open customer complaints.
What we did
We provided a quality expert whose task was to handle and reduce customer complaints. Working with the neighbouring departments, the expert set up an effective complaint-handling method and process, which the plant adopted as its standard.
The result
Instead of 50 open complaints, the pipeline settled at one or two at any time. Customer satisfaction improved markedly, and the cost of complaints fell by 80% against the previous year’s baseline.

Launching new body parts at an automotive supplier

The situation
At the Hungarian plant of an international automotive supplier, new body parts had to be brought into production for two new vehicle platforms of a premium car maker. Production milestones, the quality documentation required by the customer and the dimensional validation of the parts all had to be aligned.
What we did
We provided a project manager, APQP and PPAP expert support and measuring-room support. The project manager coordinated production, quality and the measuring room, and tracked milestones, open actions and budget. We compiled the PPAP packages to the customer’s requirements and introduced a uniform optical measurement practice in the measuring room for checking the geometry of the new parts.
The result
The launch was completed on time and within the planned budget. The APQP documentation and the PPAP packages met the customer’s requirements, and the measurement results could be used directly for product validation.

A new production hall and office building at 85% of the planned cost

The situation
The Hungarian plant of an international automotive supplier built a new 6,500 m² production hall with a three-storey office building.
What we did
We ran the project management of the investment. We took part in tendering for and selecting the contractor, and in selecting the technical inspection team.
The result
The plant was completed on time, at 85% of the planned cost.

Uniform operation standards in a new plant, using MTM analysis

The situation
In a brand-new plant the products were still in ramp-up, and manual assembly had no uniform operation standard. Assembly ran in cells where operators loaded and unloaded parts by hand.
What we did
We analysed the entire product portfolio with MTM motion analysis. Based on the analysis we defined new standards for the operations and wrote the standard work instructions.
The result
The plant gained a single work-process description that became the common basis for every calculation. The standard operation times went into the ERP system and were used to calculate costs consistently; production, finance and HR all worked from them, and operator training was built on them too.